FERTCO Indiana Blending Facility

The Project includes construction of a new fertilizer blending facility, located at the Prairies Edge Dairy Farms, fka Fair Oaks Farms, in Fair Oaks Indiana. Work includes engineering design work for civil, structural, architectural, mechanical, electrical, and facility automation. The Work also includes the construction and installation of manure cake and mineral receiving structures, site work, HVAC, electrical, utility connections and storm water control structures. The construction of the Mineral Building, the FEECO Building, the Finished Product Storage Building (including three (3) Finish Product Storage Bins), the Administration Building Sub-structure within the Storage Building Structure, the Electrical Room Sub-structure within the FEECO Building Structure. Construction of concrete pad for a dual baghouse installation, the concrete structures for the truck scale, the sewer lift station; Construct and install a 30 gpm potable water well with adequate well pump, per DNR specifications, and the modifications to the dryer combustion chamber to allow for Co-Generation to be added at a later date.

Project Details

Project Location: Fair Oaks, Indiana
Project Start: Fall 2016
Project Completion: Spring 2017
Contract Size: $16M
Site Superintendent: Warren Sterner
Mechanical Superintendent: Craig Jones
Project Manager: Stan Miller
Owner: FERTCO Indiana, LLC
Engineer: Aqua Engineering

 Project Photos